How long does manufacturing take?
- General
- Product & Design
- Installation & Delivery
- Pricing & Payment
- Compliance & Council Approvals
- Warranty & Support
- Optional Features & Upgrades
- Process & Timeline
- Sustainability & Efficiency
- Design & Features
- Installation & Site Preparation
- Compliance & Regulations
- Pricing & Financial Considerations
- Septic & Wastewater Systems
- Accessibility & NDIS Options
- Expandify Knowledge Blogs
Manufacturing for Expandify homes takes approximately 8 to 9 weeks from production start to factory completion.
All homes are manufactured in a factory-controlled environment with a highly efficient batch production model. This ensures faster turnaround times compared to traditional on-site construction and allows quality assurance to be maintained at every stage.
- Crest and Peak models follow the same build timeline
- No priority or rush builds are offered — all homes are built in the order of their batch cycle
This manufacturing model is one of the key reasons Expandify is able to maintain speed, consistency, and cost efficiency.