Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
  • Home

Process & Timeline

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • General
  • Product & Design
  • Installation & Delivery
  • Pricing & Payment
  • Compliance & Council Approvals
  • Warranty & Support
  • Optional Features & Upgrades
  • Process & Timeline
  • Sustainability & Efficiency
  • Design & Features
  • Installation & Site Preparation
  • Compliance & Regulations
  • Pricing & Financial Considerations
  • Septic & Wastewater Systems
  • Accessibility & NDIS Options
  • Expandify Knowledge Blogs
+ More

Process & Timeline

  • What are the steps to purchasing an Expandify home?
  • What is the Batch Production Process, and how does it work?
  • How long does it take to manufacture an Expandify home?
  • How long does shipping take once my home is ready?
  • What happens during the handover process?
  • When should I arrange for site preparation?
  • How do I track my order status?
  • Can I visit the factory while my home is being built?
  • What happens if my home is delayed?
  • How do I coordinate my home's delivery and installation?
  • How long does manufacturing take?
  • How does your batch build process work?
  • Who oversees quality control in the offshore factory?
  • Do you provide project management for the full build?
  • What is the average lead time from deposit to handover?
  • How long from contract to delivery?
  • Do you help with drafting site plans and documentation?
  • Can I track the build or get photo updates?
  • Where are Expandify homes built?
  • Are inspections completed before delivery?
  • What’s included in the Preliminary Site Feasibility Check (Prelim) council consultation?
  • How long does the Preliminary Site Feasibility Check (Prelim) process take?
  • What is a batch build cycle?
  • How often do batch builds occur?
  • How long does manufacturing take?
  • Are your homes made in Australia?
  • Who oversees quality control during the build?
  • What is included in the Site Assessment?
  • How long does the Site Assessment take?
  • What does the builder do in the Complete Package?
  • Is a builder included in the quote?
  • Are inspections done during construction?
  • How do I track progress of my order?
  • Do I get photos during production?
  • How long does it take from order to delivery?
  • What is the build timeline?
  • How long is shipping from the factory?
  • Can I choose my batch date?
  • What’s the minimum order for a batch?
  • Can I visit the factory?
  • Do you send video walkthroughs?
  • Do you offer virtual tours?
  • Support Page

Popular Articles

  1. What is the Batch Production Process, and how does it work?
  2. Does it come pre-wired for solar?
  3. Can I speak to someone about custom needs?
  4. What if I’m in a flood zone?
  5. Can I shift a room to a different side?
  6. What’s the internal ceiling height of an Expandify home?
  7. Can I pick it up myself?
  8. Can I choose where the switches go?
  9. Is the patio included in the base size?

Copyright 2025 – Expandify.

Knowledge Base Software powered by Helpjuice

Expand