Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
  • Home
  • Process & Timeline

What’s the minimum order for a batch?

Written by Louise Pershouse

Updated at March 31st, 2025

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • General
  • Product & Design
  • Installation & Delivery
  • Pricing & Payment
  • Compliance & Council Approvals
  • Warranty & Support
  • Optional Features & Upgrades
  • Process & Timeline
  • Sustainability & Efficiency
  • Design & Features
  • Installation & Site Preparation
  • Compliance & Regulations
  • Pricing & Financial Considerations
  • Septic & Wastewater Systems
  • Accessibility & NDIS Options
  • Expandify Knowledge Blogs
+ More

Expandify homes are produced in grouped manufacturing batches, with a minimum of six homes required to commence a new batch.

This batching model ensures efficiency in:

  • Production and material ordering
  • Quality assurance and process control
  • Export shipping logistics

Once your contract is signed, you are placed in the next available batch, unless otherwise requested. When your batch reaches the six-home minimum, production is formally scheduled. If your batch has fewer than six homes ready, you may experience a short wait before manufacturing begins.

You will be kept updated on batch progress via your customer portal.

When does my production start?

Production begins once the following conditions are met:

  • You’ve signed the supply contract and paid the initial deposit
  • Your batch has reached the six-home minimum
  • Your floorplan and colour selections are finalised

Once your batch is confirmed, your home enters the structured manufacturing timeline, which includes:

  • Frame and roof structure assembly
  • Wall and floor system construction
  • Internal fit-out (kitchen, bathroom, laundry)
  • Quality assurance and pre-export inspections

Your Buildertrend customer portal will provide milestone updates throughout production. Customers receive photo updates closer to final completion and can request further information during the process.

Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • What are the steps to purchasing an Expandify home?
  • What is the Batch Production Process, and how does it work?
  • How long does it take to manufacture an Expandify home?
  • How long does shipping take once my home is ready?
  • What happens during the handover process?

Copyright 2025 – Expandify.

Knowledge Base Software powered by Helpjuice

Expand